Kamis, 09 Maret 2017

9 March 2017

Morning line Up :
  1. Motivate the team to focus in water and electricity consumption.

Leader Line Up :
  1. Install SDB in M1, M3 and M6. M2 still occupied.
  2. Prepare EA at Mansion 6
  3. Install lime stone wallin commond area

Work Activities

 Commend from Pak Agus to put the Evacuation route in Palimanan Wall in top of the Lighting Switch.

 Pool Pump upper pool M1 burn the water goes down till the inlet.
 Install SDB in Guest M6


B&O TV problem in M6 if using the DVD, the line coming in the screen.
 Refill Solar Tank 5000 liters


 End Solar meter 5940 Liters
 After Refill 5000 liters Solar
 Before refill

 Start Solar meter 890 Liters



 

Rabu, 08 Maret 2017

8 March 2017

Morning line Up:
  1. Discuss about Outing Engineering.
Leader Line Up:
  1. Install DVD in Mansion 6, new DVD Blueray Samsung
  2. Install CCTV power cable in Main Gate 
  3. Send Email for Blocking Mansion 6 for Working CCTV, Ceiling and Pool deck.
Working Activities

Install CCTV power cable for Main Gate Mansion 
 Escort Slaes from Nano Energi for inspect Mansion lights, LED dimmable one.


 They can support all lighting from LED with dimmable system for Mansion.

Selasa, 07 Maret 2017

7 March 2017

Morning Line Up :
  1. Motivated the team for do better in every single jobs taht been given.
Leader Line Up :
  1. Prepare EA in M3, all mansion will occupied.
  2. Install new Power cable for CCTV Commond area 
 Got complain from Pak Suarma leaking from tap battub Master M3,
Change the Water faucet filter cause the old one already broken and dirty.

 AC in Mansion 3 kitchen error A9
 Get Complain from Butler, Bu Atik in Mansion 2 the coffee machine didn't work.
The Water sensor in ank not there, missing. so the machine can't use.
take the sensor and water tank from Mansion 1
 Guest asking to have SDB in their room!
Install new one from Mansion 1, first need to reprogram to LP.
Put the SDB in Wardrobe.

Senin, 06 Maret 2017

6 March 2017

Morning Line Up :
  1. Continue PIP for Wifi System defect
Leader Line Up:
  1. Prepare EA in M1, M2, M5 and M6
Work Activities

Check Pool gutter in M1


 Pool Pump M1

 Internet M5 can't work properly. no link data coming from IT room

 Change Bulb in M6

 Repair Mini bar cabinet in M3 4th bedroom
 Broken Ceiling in M3 Home Theatre bathroom
 Gold ceiling lights in 4th bedroom M3 looks so bad.


Jumat, 03 Maret 2017

3 March 2017

Morning line Up :
  1. Continue PIP process regarding leaking

Leader line Up:
  1. Prepare M2 for Farm trip activities
  2. Continue install power cable for CCTV common area
Work Activities

PIP Performances Improvement Plan
 Install cable power for CCTV commond area

 

Kamis, 02 Maret 2017

2 March 2017

Morning Line Up :
  1. Discuss about PIP (proses improvement plan) about Wifi defect probelem
Leader Line Up:
  1. Install power cable for CCTV in common area, the power taking from Mansion directly
Work Activiteies

Inspect leaking in M3 master bedroom 

 Install cable power for CCTV in top of plant room
 Change Fused light in master bathroom M2 2 pcs




 Mozic floor need to purchase for repair this indoor shower M2, lot of missing mozaic
 Repair master bathtub stoper, handle missing item.
 Escort Pak Guntur to check the Generator Problem
 Escort PLN team to do check in cubical and trafo room.

Rabu, 01 Maret 2017

1 March 2017

Morning Line Up :
  1. Melanjutkan pembahasan tentang kitchen equipment, khusunya Chiller, freezer dan Cold room
Leader Line Up :
  1. PM untuk AC outdoor
  2. Buggy di request agar di fix permanen gar tidak lepas, commend dari Pak eric.
 Ambil Meteran air untuk di Mansion dan kirim ke petugas Dispenda. tetapi struknya belum dikasih kembali.

 Cek ke Villa 63 untuk lihat posisi naruh Evacuation Maps.