Senin, 25 September 2017

25 September 2017

Morning Line Up :
  1. Fire electric pump already Auto Position but the alarm system to MCFA not connected yet.
  2. Explain about Project Gym in Mansion 5.
Leader Line Up :
  1. CARE working in public area Mansion to repaint hydrant pillar and box.
  2.  M2 check pump pool and pond leaking
  3. SKJ need to connect the fire electric pump sensor. now the pump running with auto system.

Work Activities :

Stair installation for Mansion 5 Gym project.






 Change Batteries Mansion 2.









 Maintenance Genset
 Update Afternoon Project Gym.


Kamis, 14 September 2017

14 September 2017

Morning Line Up :

Transcendent

Leader Line Up :
  1.  CARE in GWT repaint Hydrant pipe
  2. Change Baterai remote in M5, M2 and M6
  3. PM Fire Extinguisher in M5, M2 and M6
  4. Test Fire Hydrant
Work Activities :
 Check all Fire Extinguisher Mansion


































 Tide up the cable in TV drawer living Mansion 3.