Selasa, 25 Juli 2017

25 July 2017

Morning Line Up :

Share information about Buyout preparation.

Leader Line Up :
  1. M6 if possible will change the termite wooden floor
  2. Prepare for Buggy station charger in Mansion Parking lot.
  3. Set Up Grill Mansion Manager in generator Area cause still have guest in house in mansion 1.
    Heat Pump, Steam, and yacuzzi need to have training for basic things.
CARE report must conduct every month.
Work Activities :
World Class leader By Luna Bajracahya: " A Turkey or an Eagle "
  1. Strategy : Planing, Organizing, and Priotizes.
  2. Empowerment : Go and Ask about result and Process
  3. Communication : Clear, concise, compelling
  4. Talent & Development : Leader developer of Leaders 
  5. Result Focus
  6. Execution : Ideas into Action

Send Buggy R3 for Service by Buggy Technician prepare for Buyout.

Repair main door M6 info from Pak suarma can't close the door properly, next time will need to setting more accurate, cause right now can't do it.



Senin, 24 Juli 2017

24 July 2017

Leader line Up :
  1. Test hydrant Pillar
  2.  CARE repaint Solar tank in common Area
  3. After check out in Mansion 6 will repair the floor in master and headboard in double room.
Work Activities :
Green book training : 9 -Step Quality Planning
  • Define :  
    • Identify Output
    • Identify Customer
    • Identify Customer Requirements
    • Translate Voice of Customer into specification
  • Design :
    • Design and develop the steps
    • Select measurements
    • Run test Pilot
  • Improve :
    • Evaluate the result
    • Optimize and Suistain
Monthly Meeting :

  1. Tools will Inventory first, and will order new tools.
  2. Uniform in 3 month will be purchase new design.
  3. Every Engineering must know about the Room Cost regarding the Energy per hour, per day and per square meter.
  4. Visit to sister company will held after all villa enhancement already finish.
  5. there will be visit to villa enhancement 1 week before hand over/schedule repair finished.

 Paras Stone in Security mansion broken caused of CCTV guy install new Cable.
 Send Buggy R6 for Maintenance for ready to Buy Out.


Jumat, 21 Juli 2017

21 July 2017

Morning Line Up :
  1. Share information about Bulgari FESTA buy out.
  2. Water consumption go high.
Leader Line Up :
  1. Check Mansion 1 for Smell
  2. Prepare EA Mansion 2 for Owner and M6 for guest.
  3. Maintenance Hydrant Pillar
Work Activities :
Housekeeping Clean the Window in Mansion 2, never dry the water. they just keep the water in the wood. this is why our paint easily dissapear cause using deterjen.







 Service Buggy Mansion 5 for ready for Buyout.

 Take Pictures of Mansion 2 Deck taht already in bad condition



 Asking team Garden to trim the Trees near Mansion 1 for make the area more clean and reduce the smell.


 CARE Team back working to maintain Mansion Manager Ofice.

 Closed the Pipe in Mansion 1 Nany room with Plactic for temporary.
Fogging from AC drain, and the AC is full of Smoke. in Double wardrobe and Nanny ceiling.









 

Kamis, 20 Juli 2017

20 July 2017

Morning Line Up :

Share about Bulgari FESTA buy out

Leader Line Up :
  1. Mansion 1, check AC and bed Smell.
  2. Meeting Bulgari FESTA at 1. Pm at Arrival pavilliun
    CARE report must Conduct every month. Give Information must be good and with data or paper.

    Operational Mansion will help by Pak Andy Maulana by focusing to 3 things taht Pak yuji focus also :
    1. Gold Ceiling
    2. Air Condition
    3. Smell

 Work Activities :

Mansion 1 check Bed Smell and AC
Meeting Bulgari FESTA in Mansion 2 :
  1. Mansion 2 living will clear up all equipment on 27th July in the Morning
  2. Engineering will prepare for the Power socket for the Jewelry showcase.
  3. Engineering need to prepare for the  white cable for power in the middle showcase.
Meeting Garden Mansion handover :
  1.  3 month will have a review regarding the staff attitude, Greetings, uniform and what can do, or cant.
  2. Will review regarding the contract include the tools and everything.
  3. There will be report working before and After.
  4. Attendance will follow the Hotel requirement during special Holiday.

Leadership meeting.

WA bu Fanny to get permission working in Mansion 1 Nanny room.
Nanny's Ceiling  condition, foun 1 pipe open and dop with 2' pipe.

 Taking Energy Pictures













 Mansion 6, CT electric meter.








 Mansion 3, CT electric meter.