Morning Line Up :

Trip Advisor Rank

Leader Line Up :
  1. CARE still Continue in Mansion 3
  2. Change Penjor Light M6
  3. Terminix in Mansion has no spraying tools for working.
"Two Way Learning = learned & Share"
 Fire Extinguisher and Hydrant Pillar check will do first week every Month

Work Activities :
In System Mansion 5 will block from 15th September until 15th December 2017

Taking Picture of Serial Number Aqua dispenser in Engineering Office.
 Install Paras Stone Wall and lime Stone  in Mansion 1

 Spraying Artwork Mansion 1 by Terminix
 Check Flow Switch in Mansion 6, there is error indication in MCFA flow switch On.




Selasa, 12 September 2017

12 September 2017

Morning Line Up :

New Ritz Carlton Langkawi

Leader Line Up :
  1. CARE Start in Mansion 3 until 15 September 2017 and will continue 18 September 2017 because we have Photo shoot in M3 on 17th September.
  2. Repair Pond Pump Mansion 1.
  3. Change sand Filter Mansion 2.
"Will send All Supervisor and leader to Have License for Safety and K3"
Work Activities :

Checklist report Pool Mansion 2
Change Pool pump position to Pump 1 and Pump 2, now in Mansion 2 running with Auto system and Timer.
Next all Pool Pump will running Auto with timer system.




 Mansion 6 Pool Pump only 1 Pump running, the other 2 pumps 2 PK for upper still working, but different type. will take this pump and Install in Pond Area.

 Modified Standign Lamp already Coming and will ask for Approved from Pak Andy or Bu Luna.


 Fire electric Pump already standby in Auto Position.
 Backwash Sand Filter.

 Backwash Carbon Filter.

 This is the model for Stepping and Grass in Mansion 6.

Kamis, 07 September 2017

7 September 2017

Mornign Line Up :

Villa Enchantment

Work Activities :

Pak Widhi Darmawan called and asked to escort the Potential Buyer see the Mansion 6. 

Test Random Fire Alarm System in All Mansion with SKJ Team.





 Pak Eko B&O change Panel TV for Mansion 6 in Genset store room.
 4th Bedroom diverter already workign but still leaking.
 All Defect list already done in Mansion 2.

Rabu, 06 September 2017

6 September 2017

Morning Line Up :

Engineering GOAL setup


Work Activities :


Meeting with Pak Wahyu (SIKA), Pak Eko and Pak Agus, discuss about Guarantee Point that need to add.

Check Batteries Buggy R1, Buggy Technicians only change 6 of 8 new batteries that i ordered.
 new Hole for TV Socket Terrazzo kitchen M2.


 Tkae Pictures of Follow up defect list Mansion 6.











Selasa, 05 September 2017

5 September 2017

Morning Line Up :
Trip Advisor Target and Goal, our Postion today #147

Leader line Up :
  1. CARE still continue in Mansion 2
  2. M3 repair drain Bathtube Double, felt down in basement Area.
  3. M1 will have inspection with Pak Nengah Indosekar, need to bring also to Spa and Beach.

Work Activities :

Follow up bath tube handle in Mansion 2 Home theater that leaking, difficult to open, will continue Tomorrow.

Change TV socket position in kitchen Mansion 2
 Walk through in Mansion 1 With Pak Nengah, Pak Ketut and Pak Wayan Indosekar Team.

Walk through in Mansion 3 with Pak Nengah, Pak Ketut and Pak Wayan Indosekar Team.
 Walk through in La Spaggia with Pak Nengah, Pak Ketut and Pak Wayan Indosekar Team.
 Room deck Cndition in Mansion 2.



 New Position of TV Socket Mansion 2.
 Follow Up Defect List Mansion 2.
 Generator run time.