Preparation for Buy Out
Leader Line Up :
- M3 and M5 Check In
- CARE in M5 install ceramic tile in Basement area and repair door to project M5
"Water and Electricity must be control and monitor"Work Activities :
Check AC Power in Mansion 6 Spa room, the MCB always Trip.
Repair Pilar light outdoor terrace Living M1,
Turn ON pond Pump M1.
Repair slow drain sink in Master Bathroom Mansion 1
Monitor Vendor preparation in Mansion 2
Take pictures from top comparison the color of the Wood.