Kamis, 14 Desember 2017

14 December 2017

Morning Line Up :

Preparation for Buy Out

Leader Line Up :
  1. M3 and M5 Check In
  2. CARE in M5 install ceramic tile in Basement area and repair door to project M5

 "Water and Electricity must be control and monitor"
Work Activities :

Check AC Power in Mansion 6 Spa room, the MCB always Trip.
Repair Pilar light outdoor terrace Living M1,
Turn ON pond Pump M1.
Repair slow drain sink in Master Bathroom Mansion 1



 Monitor Vendor preparation in Mansion 2











 Take pictures from top comparison the color of the Wood.


Tidak ada komentar:

Posting Komentar