Discuss about Water reduce and Eng Goal
Leader Line Up :
- Prepare EA M3; Minibar change in master, Chiller fridge Problem will take from Mansion 5, install new sticker in Guest
- M5 will request lot of item regarding the Project and defect list walk through.
- Inspection in M5
Work Activities :
Take Fridge Control from M5 install in M3
Repair main door lock, cant lock and difficult to open using the key.
Check electricity meter and Surge protection.
Defect list Mansion 5
Main Gate mansion broken
Repair Wood decking in front of master room M2.
Tidak ada komentar:
Posting Komentar