Rabu, 11 Oktober 2017

11 October 2017

Morning Line Up :

  1. Engineering will go to Karangasem on Monday, 16 Oct 2017 for give the donation.



Leader Line Up  :


    1. Check M1 & M2 for final report Leaking.
    2. CARE Still Continue in Mansion 3
    3. Repair Water Meter M3
    Will do inspection today in Mansion 5.
    Report for leaking must be send today before Home. use the same format as Pak Putu report.

    Work Activities :

    Walk through to Mansion 5 for Project :

    1. The Project continue make Pillar foundation for the Building
    2. On friday they will make noise for the entire day using Stanper mesin to stamp the land to make more solid.
    3. Need focus on Landscape, especially Cables and Conduit that can seen.
    4. Need to add more plant to cover the area especially in Area Mansiion Generator.
    5. Security post need to follow up to cover the garden and install cobel stone.








    CARE in Mansion 3.

     Project in Mansion 5 to build Gym room. The project do overtime.