Kamis, 14 Desember 2017

14 December 2017

Morning Line Up :

Preparation for Buy Out

Leader Line Up :
  1. M3 and M5 Check In
  2. CARE in M5 install ceramic tile in Basement area and repair door to project M5

 "Water and Electricity must be control and monitor"
Work Activities :

Check AC Power in Mansion 6 Spa room, the MCB always Trip.
Repair Pilar light outdoor terrace Living M1,
Turn ON pond Pump M1.
Repair slow drain sink in Master Bathroom Mansion 1



 Monitor Vendor preparation in Mansion 2











 Take pictures from top comparison the color of the Wood.


Senin, 04 Desember 2017

4 December 2017

Morning Line Up :

Update Mount Agung Condition

GT Line Up :
  1. La spaggia build hook for the net
  2. Install new andesit floor for toilet restorant
  3. CARE #39 : scrath floor and furniture
  4. Follow up promikro defect
  5. Saving energy ; keep monitoring for vacant Villas
  6. Garden Team ; focus to clean weed in Spa Area and Batu 3
Work Activities :

Transcendent not working because the License.
Bu Luna and Pak Yuji comment about the hydrant tap cannot hide because  the bolt come outdside.
Inspection in Masnion 5 with Bu Luna and Pak Yuji regarding new Project.




Service long chair Mansion 5
Check wooden deck repair by CARE Team in Mansion 5

Measure the Spa Door for change the door to the new Gym









Update Project Gym Mansion 5.