Prepare for BPBD Audit
Leader Line Up :
- CARE in Mansion 3 for HT Wooden Floor Bubbling
- Check Door lock in Mansion 6 for EA tomorrow
- Repair Double Toilet door in M5 that complain by the guest.
Tomorrow must do Handover to Pak Putu Muliastra for Mansion
Work Activities :
Check CARE in Mansion 3.
Repair Socket in Bar counter no Power, the neutral cable miss out.
Repair telephone socket in toilet Living
Repair door Lock in M5 double toilet
Cleaning Smoke Detector that ringing in SPA Mansion 3, false Alarm
Check APAR Mansion
Tidak ada komentar:
Posting Komentar