Jumat, 26 Mei 2017

26 May 2017

Morning Line Up :
Discuss about RO System

Work Activities :
Take Pictures of follow up defect list Manion 1, mansion 3 and mansion 5

















Senin, 22 Mei 2017

22 May 2017

Leader Line Up :
  1. CARE at M3 ; Finishing outdoor dining, Home theatre bubbling floor and Living Pilar.
  2. Cut trees in M3 and 6 to open view.
  3. Cut trees in M2 to open view.

Work Activities :


Mansion 5 :
  1. Check Pak Imam reinstall  the wood ceiling at porthe cochere.
  2. Check Pak Imam cleaning the Buggy parking Area, water just stay there need to make new drain.
  3. Check Pak Imam installing batu paras to cover drain gutter planter box melati and floor for LPG Tank.
  4. Check Pak Imam to cover the andesit floor from rain water pipe.
  5. Check Pak Andre For Waterproofing and grouting the drain hole
  6. Check Pak Andre for Opname the work taht been done
  7. Check Pak Winarto from Jati Indah repain tthe floor deck indoor shower 
  8. Check Pak gatot for Paint formula from Pak Herman.
Mansion 3 (CARE MANSION) :
  1. Asking Garden team to plant more grass in entrance garden.
  2. Show the team what else need to follow up which not in the defect list.
Tropical Line Inspection with Pak Cok rai.
  1. Discuss about the problem with Pak Andy
  2. walkthroughs to M5, M6 and M3 so Pak Cok can determine and give feedback about the visit.
 Pak Imam cover drain already finish.

 Grass dead caused of lot of cement and stone in entrance area

 New drain already covered back
 Grass already done for Living Art Planter box.

 For Sika Waterproofing already done doing the waterproofing.


 CARE follow up Mansion 3.















 Pictures with tropical line Leader.


Kamis, 18 Mei 2017

18 May 2017

Morning Line Up :
  1. Marriot Engagement survey Goal is 100%
Leader Line Up :
  1. CARE M3  Will move to outdoor dining Area, need materials kemtone to come soon
  2. Take out all M3 Pool Pump to get rewinding to vendor
  3. Pak Nyoman will plant menuri and japanese grass in planter box Living M5
  4. Jati Indah will start fininsing on Staurday and thursday will install the wood for Pool deck terrace M5
Work Activities :

Check material bring by team Sika 12 Pail

Use this kind of grouting sika

Pak Imam worker continue to install batu bata and cover with batu Paras to cover Planter box melati in M5

Install batu bata and batu paras cover for drain Pipe Planter Box Brumelia
Asking team garden to clear up and cut the boungenvile trees,