- CARE at M3 ; Finishing outdoor dining, Home theatre bubbling floor and Living Pilar.
- Cut trees in M3 and 6 to open view.
- Cut trees in M2 to open view.
Work Activities :
Mansion 5 :
- Check Pak Imam reinstall the wood ceiling at porthe cochere.
- Check Pak Imam cleaning the Buggy parking Area, water just stay there need to make new drain.
- Check Pak Imam installing batu paras to cover drain gutter planter box melati and floor for LPG Tank.
- Check Pak Imam to cover the andesit floor from rain water pipe.
- Check Pak Andre For Waterproofing and grouting the drain hole
- Check Pak Andre for Opname the work taht been done
- Check Pak Winarto from Jati Indah repain tthe floor deck indoor shower
- Check Pak gatot for Paint formula from Pak Herman.
- Asking Garden team to plant more grass in entrance garden.
- Show the team what else need to follow up which not in the defect list.
- Discuss about the problem with Pak Andy
- walkthroughs to M5, M6 and M3 so Pak Cok can determine and give feedback about the visit.
Grass dead caused of lot of cement and stone in entrance area
New drain already covered back
Grass already done for Living Art Planter box.
For Sika Waterproofing already done doing the waterproofing.
CARE follow up Mansion 3.
Pictures with tropical line Leader.
Tidak ada komentar:
Posting Komentar