Senin, 13 Maret 2017

13 March 2017

Leader Line Up:
  1. M6 blocked today 13-15 March 2017 for Repainting pool deck, repainting ceiling double bathroom  and CCTV power.
  2. Mansion 1 will do Camera inspection with Pak Erwin to see the gold ceiling.
  3.  Will order new pool pump hayward for each Mansion. 
Work Activities:

Change leaking valve in Mansion 3 water meter area

Test Sayerlack product for antijamur in M6







 