Kamis, 16 Maret 2017

16 March 2017

Morning line Up :

Discuss about Enhanment villas after project.


Leader Line Up:
  1. Clear up Lights in M2, used for photo shooting.
  2. Prepare EA M5 and M6 tomorrow
  3. Check outdoor lighting M3, get info from Pak Warga that already route new cable but still drop.

Work Activities :
Prepare Ea for M3 Pak Tikno, take the Power control Fridge from M5.


 Repair lighting in 4th bedroom bathtub ceiling

 Repaint 4th bedroom Ceiling
 Repair Blocking sink in 4th Bedroom M3