Selasa, 13 Juni 2017

13 June 2017

Morning Line Up :

Review SOP for Kitchen Engineer.

GT line Up :
  1. M5 Final check for CARE Team and handover will be 15 June
  2. Villa 30 will follow up the master switch
  3. Villa 37-40 will install the pool pump for hand over at 18 June
  4. Villa 18 -21 will hand over on 30 june
  5. Wifi problem need fast solution
Work Activities :

 During rain, the water still stack on the floor near the drain in living terrace Mansion 5

 The progress for remove the stone very slow caused of the rain
 Found leaking from the drain pipe in Mansion 1 pantry.




 CARE team put more soil to the paving block
 Remove the fan in living M5 to change and check the condition.

 Till afternoon the stone still few in the roof.



 

Tidak ada komentar:

Posting Komentar