Review SOP for Kitchen Engineer.
GT line Up :
- M5 Final check for CARE Team and handover will be 15 June
- Villa 30 will follow up the master switch
- Villa 37-40 will install the pool pump for hand over at 18 June
- Villa 18 -21 will hand over on 30 june
- Wifi problem need fast solution
During rain, the water still stack on the floor near the drain in living terrace Mansion 5
The progress for remove the stone very slow caused of the rain
Found leaking from the drain pipe in Mansion 1 pantry.
CARE team put more soil to the paving block
Remove the fan in living M5 to change and check the condition.
Till afternoon the stone still few in the roof.