Need to make vendor list for easy communication
Leader Line Up :
- Change cut-off valve Indoor shower M2 and M5(after check out), got a long one from Pak John Bunnel.
- Care follow up new defect list in Mansion 2.
- Check energy consumption M1 after guest check out.
- maintenance Fire Extinguisher M1, M2 and M5 after check out.
Work Activities :
Change cut-off valve Indoor shower M2 and M5(after check out), got a long one from Pak John Bunnel.
Take Pictures of Follow up the new Inspection in Mansion 2.
Change the Rain cover for Buggy mansion 2.
Take data for monthly PM transcendent Generator Mansion.
Take Pictures of Follow up walk through Mansion 5.
Tidak ada komentar:
Posting Komentar