"Can Do" Attitude refresh
GT Line up :
- Alang-alang project still continue in #33
- Install Washbacin and lights in Recreation room
- Kitchen, PM undercounter and install Boiling fan
- Install ceramic tiles in FOM office
- Prepare EA in M1 for owner check in
- Buggy Maintenance A6 & 11(engineering)
Work Activities :
Early Morning got information from butler that electricity in M6 went off for all area M6.
Check to M6 found no power in SDB M6, checked to Power Plant room Panel found that MCCB tripped. dont know why and directly turn it ON. and check in M6 area found the problem from aircond.
Project in M5 (ex brumelia planter box)
Drain water heater in M1, dirty caused of maintenance (cleaning water heater) in all water knob
Follow up defect list Mansion 1 pantry living
New terracota already arrived but in bad condition need to repaint with terracota
Need to order this paint for Wardrobe Wall in All Mansion
Follow up defect list Mansion 1.